Projects View

ANDRITZ Received an order to supply HERB Recovery Boiler to Moorim P&P Mill, South Korea

ANDRITZ Received an order to supply HERB Recovery Boiler to Moorim P&P Mill, South Korea

Specifications:

Name:

ANDRITZ Received an order to supply HERB Recovery Boiler to Moorim P&P Mill, South Korea

Location:

South Korea

Company:

ANDRITZ

Estimated Cost:

-

Source:

https://www.andritz.com/

Introduction:

ANDRITZ has received an order for a new HERB recovery boiler including advanced digitalization solutions to be installed at Moorim P&P’s pulp and paper mill in Ulsan, South Korea.

Features:

The contract signed with power plant supplier SGC eTEC E&C includes the engineering and main equipment supply for the boiler, digitalization solutions (ANDRITZ autonomous recovery boiler solutions) for maximum use of the boiler’s potential, and an ash treatment system.

The delivery will increase the economic and environmental sustainability of the mill’s operations.

Replacing two existing boiler units, the new HERB boiler will enable more efficient chemical recovery from the black liquor at lower emissions. Together with a new steam turbine, it will also significantly increase the mill’s renewable energy production. Thus, the delivery will make mill operations more self-sufficient, economical and sustainable. HERB recovery boilers are part of ANDRITZ’s broad portfolio of sustainable products that the company keeps advancing and expanding.